RGT2 LNG Tank
Pengerang,
Malaysia
The re-gasification terminal (known as RGT-2) is part of Malaysia's development plan to secure stable natural gas supply for the nearby refinery and Petrochemical Integrated Development (RAPID), Pengerang Co-generation Plan (PCP) and also to the Peninsular Gas Utilization (PGU) Grid. This LNG Tank will have the capacity of 5 million tons per annual and two 200,000 cubmic meter LNG storage tank
Location
Main Application
Water Retaining Structures
Project participants
Customer: Samsung C&T Corporation
The Project
Detailed cycle planning with optimized system use
Detailed cycle planning with optimized system use
Detailed cycle planning with optimized system use
Detailed cycle planning with optimized system use
Detailed cycle planning with optimized system use
Detailed cycle planning with optimized system use
Project Information
Mr. Alex Seo
Civil Manager
We are satisfied with PERI formwork not only the material but also their continuous technical support at site. PERI system are versatile and easy to handle during assembly, jumping and rectifying.
Are you working on a project like this?
Call us on + 60 (03) 7969 1088 to discuss your requirements further.