
- Easy to use
Robust & Lightweight
- 22-24 kg/m² in average, it can be easily handled manually.
- No specialized tools or skilled labor are required.
- No Plastering Needed
High Precision
- Fully extruded panels.
- Factory-based intelligent digital mockup.
- Error-free site execution.
- Fast and Efficient
Fast Construction Cycle
- Less tie levels.
- Eliminating grouting of tie holes.
- Early striking.
- Fast cycle times.
- High resusability
Cost-Efficient
- High reusability of standard panels for multiple projects.
- Powder-coated Aluminium panels increase formwork life
- sustainability
100% Recycable
- Significant cost recovery at the end of its use.
- Environmentally sustainable solution.
- Compliance
CIDB PPS Certified
Certified IBS solution under CIDB CIS 24 for Reusable Formwork Systems.
Innovative Aluminium Formwork
For faster, safer, and more efficient constructionMONOCAST delivers fast and consistent construction cycles - ideal for large-scale, standardised residential developments such as high-rise condominiums, apartments, affordable housing, student dormitories, or government housing schemes, and more.
It is a cast in-situ solution that brings a production-line approach to the construction site. Lightweight, durable, and reusable, it transforms the project site into a highly efficient and well-organised build environment.
-
Precision and speed
MONOCAST system's design ensures highly efficient forming, with minimal components and high precision. Precision in panels and connections, along with powder-coated panels, ensures a smooth, high-quality finish that reduces the need for plastering work.
-
Maximize design flexibility
MONOCAST maximises the use of standard panels for speed and consistency, while customised corner panels provide the flexibility to suit various designs, delivering the ideal balance of efficiency and adaptability on-site.
-
Efficient flat snap tie
MONOCAST is designed to be efficient to use and intuitive as possible. The panels require only 6 tie levels to handle 60 kN/m² concrete pressure up to a height of 3.3 m.
After concreting, flat snap tie can be easily broken 6 mm from the concrete surface, eliminating the need for grouting and curing.
Product Data Sheet

Call us on + 60 (03) 7969 1088 to discuss your requirements further.